Golden Plains Wind Farm

Client: MPC Kinetic

The Golden Plains Wind Farm Project involves the establishment of a wind energy facility including wind turbines and associated electrical infrastructure on 16,723 ha to the West, South and Southeast of Rokewood, a small rural town in the Shire of Golden Plains: approximately 60 km North West of Geelong.

The approved development will consist of up to 228, 6 MW wind turbines. The project will generate over 4000 GWh per annum of electricity, enough to power more than 765,000 homes –and prevent more than 4 million tonnes of carbon dioxide from being emitted to the atmosphere each year.

Construction began in early 2023.

Pearce Geotech was engaged by MPC Kinetic to conduct the Construction Materials and Geotechnical testing for this project.

This is yet another renewables project Pearce Geotech Pty Ltd is involved in and further solidifies us as a leader in these types of projects.

Overview

The Golden Plains Wind Farm Project will consist of up to 228, 6 MW wind turbines. The project will generate over 4000 GWh per annum of electricity, enough to power more than 765,000 homes –and prevent more than 4 million tonnes of carbon dioxide from being emitted to the atmosphere each year.

Do you need material testing? Fill out this form.

Request a Test

Accredited Service Providers

AS1289
AS1141
DIN18134-2012